Client: Belfast Institute of further and higher Education Contract: Pipe run 10th floor Brunswick St Belfast GB Electrics were contracted by BIFHE to remove pipe lagging and carry out environmental clean on the above installation.
A Chlorifier which has just been stripped using a multi needle injection system